Cement clinker production ;PO42.5 cement clinker 42.5MPa; homogenization of raw material, thermal decomposition ; copper tailings

Categories:
Categories:
Unit processes/Materials production/Other mineralic materials
Location:
JX-CN
Reference year: 2021 -
Description

Copper tailings replace clay in cement clinker Data users should ensure to only include the transportation of copper tailings and replacement raw materials within the factory premises for LCA system boundary considerations. The transportation of other raw materials is excluded from the system boundaries. It is also noted that environmental impacts consequent to the production of copper tailing resource utilization products are not to be considered. The LCI results are based on actual production data and field surveys performed in 2019 in Jiangxi Province, with the absence of additional related data from research and databases. Calculation formulas for cement clinker yield factors should be used according to process consumption and emissions for accurate accounting.

Technology

Preheater - calciner - rotary furnace

Process type
Fully aggregated
LCI modeling approach
Unknown
Multifunctional modeling
NONE
Format
ILCD
Aggregation type
VERTICAL
Data provider
TianGong
Review status
Internal
Cost
Free
Contact
Tiangong LCI Data Working Group