concrete mixing factory construction, UPR, ecoinvent 3.6, Undefined

Categories:
ISIC4 categories:
F:Construction/42:Civil engineering/429:Construction of other civil engineering projects/4290:Construction of other civil engineering projects
Location:
GLO - Global
Reference year: 1997 - 2001
Description

Location: GLO - Global
The lifespan of the insfrastructure and the land occupation is assumed to be 50 years. The average yearly production is about 100'000 t/a
[The full documentation of this dataset was originally provided in the corresponding ecoinvent report from the Swiss Centre for Life Cycle Inventories, which is accessible for free to guests and users of ecoinvent version 2 (https://www.ecoinvent.org/login-databases.html). The dataset may subsequently have been subjected to central changes to the database, as described in the respective change report for each new release.]
Undefined unit processes (UPRs) are the unlinked, multi-product activity datasets that form the basis for all of the system models available in the ecoinvent database. This is the way the datasets are obtained and entered into the database by the data providers. These activity datasets are useful for investigating the environmental impacts of a specific activity (gate-to-gate), without regard to its upstream or downstream impacts.

Technology

The data of the infrastructure corresponds tohigh level of technology

Process type
Unit
Supported nomenclature
ecoinvent 3.6
LCI modeling approach
Before modeling
Multifunctional modeling
NONE
Format
ECOSPOLD2
Aggregation type
NOT_APPLICABLE
Data provider
ecoinvent
Review status
External
Cost
For sale
License

ecoinvent EULA