electricity production, wind, 1-3MW turbine, onshore, UPR, ecoinvent 3.6, Allocation, cut-off

Categories:
ISIC4 categories:
D:Electricity, gas, steam and air conditioning supply/35:Electricity, gas, steam and air conditioning supply/351:Electric power generation, transmission and distribution/3510:Electric power generation, transmission and distribution
Location:
MK - North Macedonia
Reference year: 2005 - 2019
Description

Reference product: electricity, high voltage [kWh]
Location: MK - North Macedonia
This dataset represents the production of high voltage electricity at onshore grid-connected wind power plants with a capacity between 1 (excluded) and 3 (included) MW worldwide in 2012. It includes operation and maintenance expenditures as well as infrastructure inputs. Wind load hours have been adapted to local conditions (see parameters).
At the moment, the class of onshore 1-3MW wind turbines is approximated with a 2 MW onshore wind turbine consisting of the infrastructure datasets for the 'wind turbine construction' and the 'network connection construction'. The wind turbine's parts are defined to be everything except for the network connection, i.e. rotor, nacelle, tower, and foundation.
[This dataset has been generated using the system model "Allocation, cut-off by classification". A system model describes how activity datasets are linked to form product systems. The allocation cut-off system model subdivides multi-product activities by allocation, based on a physical properties, economic, mass or other properties. By-products of waste treatment processes are cut-off, as are all by-products classified as recyclable. Markets in this model include all activities in proportion to their current production volume.
Version 3 of the ecoinvent database offers three system models to choose from. For more information, please visit: https://www.ecoinvent.org/database/system-models-in-ecoinvent-3/system-…)]

Technology

Technology of a 2MW Vestas V80 wind power plant modelled with a dataset for the wind turbine (moving+fixed parts) and a network connection each.
See dataset 'wind turbine construction, 2MW, onshore' for detailed technical information.

Process type
Unit
Supported nomenclature
ecoinvent 3.6
LCI modeling approach
Attributional
Multifunctional modeling
ECONOMIC
Format
ECOSPOLD2
Aggregation type
NOT_APPLICABLE
Data provider
ecoinvent
Review status
External
Cost
For sale
License

ecoinvent EULA

Contact
support@ecoinvent.org