pipeline construction, natural gas, long distance, low capacity, onshore, UPR, ecoinvent 3.6, Undefined

Categories:
ISIC4 categories:
F:Construction/42:Civil engineering/422:Construction of utility projects/4220:Construction of utility projects
Location:
GLO - Global
Reference year: 1990 - 2001
Description

Location: GLO - Global
It is assumed that half of the pipelines are disposed in a discharge at the end of life, the other half stays in the soil. The life time of the pipeline is 40 years.
[The full documentation of this dataset was originally provided in the corresponding ecoinvent report from the Swiss Centre for Life Cycle Inventories, which is accessible for free to guests and users of ecoinvent version 2 (https://www.ecoinvent.org/login-databases.html). The dataset may subsequently have been subjected to central changes to the database, as described in the respective change report for each new release.]
Undefined unit processes (UPRs) are the unlinked, multi-product activity datasets that form the basis for all of the system models available in the ecoinvent database. This is the way the datasets are obtained and entered into the database by the data providers. These activity datasets are useful for investigating the environmental impacts of a specific activity (gate-to-gate), without regard to its upstream or downstream impacts.

Technology

The material quantities are calculated on the basis of the geometry of the pipeline (diameter 950mm, thickness 10 mm).

Process type
Unit
Supported nomenclature
ecoinvent 3.6
LCI modeling approach
Before modeling
Multifunctional modeling
NONE
Format
ECOSPOLD2
Aggregation type
NOT_APPLICABLE
Data provider
ecoinvent
Review status
External
Cost
For sale
License

ecoinvent EULA