Category:
N/A
Location: BR Reference year: N/A - N/A

Plastic conversion, blow moulding BR

This dataset was generated following the qualidata guidelines for the Brazilian national life cycle inventory database (SICV).The reported data represents a total production volume of 55912.13 ton/yr. 1 kg of this process equals 0.8971 kg of blow moulded plastics due to mass of included additives an...
Dataset type
N/A
IBICT
Not reviewed
For sale
Go to dataset
Category:
N/A
Location: BR Reference year: N/A - N/A

Plastic conversion, extrusion, blown film BR

This dataset was generated following the qualidata guidelines for the Brazilian national life cycle inventory database (SICV). The reported data represents a total production volume of 271.31 ton/yr. 1 kg of this process equals 1.0168 kg of extruded blown film plastics due to mass of included additi...
Dataset type
N/A
IBICT
Not reviewed
For sale
Go to dataset
Category:
N/A
Location: BR Reference year: N/A - N/A

Plastic conversion, extrusion, pipe and profile BR

This dataset was generated following the qualidata guidelines for the Brazilian national life cycle inventory database (SICV).The reported data represents a total production volume of 8413.04 ton/yr. 1 kg of this process equals 1.0547 kg of extruded tube and profile plastics due to mass of included...
Dataset type
N/A
IBICT
Not reviewed
For sale
Go to dataset
Category:
N/A
Location: BR Reference year: 1977 - 2074

Electricity Brazilian hydroelectric power plants, 1kWh (product system)

Good overall data quality. Energy carrier mix information based on official statistical information. Detailed LCI of the two major hydroelectric power plants in Brazil were used. Inventory is partly based on primary industry data, partly on secondary literature data.
Dataset type
N/A
IBICT
Not reviewed
For sale
Go to dataset
Category:
N/A
Location: BR Reference year: 1977 - 2074

Itaipu hydroelectric power plant

The LCI covers all relevant process steps / technologies for the construction of an specific hydropower plant in Brazil. The inventory is based on data from interviews and power plant construction reports of Itaipu Binacional. The dam construction started in 1975, and finished during 1986. The first...
Dataset type
N/A
IBICT
Not reviewed
For sale
Go to dataset